This method statement describes the practices and methods to be used with regards to placing, curing and defect rectification of concrete works & blinding concrete. Prior to the placing of any concrete all quality checks are to be completed and the “approval to concrete” instruction issued by client/consultant. Once delivered to site the concrete will be placed in one of three manners: a) Direct (or chute) discharge b) Crane and bucket, or c) Concrete pump The method to be used shall depend on site conditions and pour volume. The concrete shall be placed in accordance with the specification for Concrete cast in place and the main points being as mentioned below. Method Of Concrete Placement Concrete is to be placed as close as possible to its final position and not moved laterally by vibration. Concrete is not to be over vibrated. Concrete is not to be dropped from a height exceeding 2m. “Cold joints” of more than 40 minutes shall be avoided. Concrete shall be placed not later than one hour after the addition of the mixing water.

Method

Useful Documents. Method Statement. ▫ Sika® MonoTop® Systems. ▫ Detailed step by step guide to concrete repair. Product Data Sheet. ▫ Product uses. Short Description. Download 011-METHOD STATEMENT FOR REPAIR OF CONCRETE WORKS.pdf. Renderoc SXtra should be mixed and applied in strict accordance with the Product Method Statement, a copy of which may be obtained from your nearest Fosroc office.

Pumping of concrete shall only be permitted after approval from Company. Unchi nichi hai dagariya mp3 song free download. If during concreting, rain is imminent sufficient plastic/canvas sheets should be on hand to cover the entire casting area. If seepage water is coming into the excavation in a significant volume or again if rain is imminent a water pump must be in place ready to operate. Concrete Curing Method After the initial set of the concrete and when the concrete is hard enough to not be damaged by such an action, the exposed concrete surface shall be covered with drenched hessian sacks. These sacks shall be left in position and maintained in a soaked condition for seven days. For formed surfaces the curing shall be applied as described above after the formwork has been removed, or a curing compound shall be applied (refer to 2.5 above).

Laitance may be removed once the concrete is hard by light chipping wire brushing. Preparation of construction joints shall be done by mechanical chipping taking care not to dislodge the coarse aggregates. This is to be done at least 24 hours after the completion of placing or a concrete surface retarder may be used.

Winning eleven 2000 psx iso torrents free. Yang kali ini sudah memasuki generasi ke enam dari seri PES melanjutkan suksesor nya yaitu PES 5. Dan di dalam peluncuran game PES 6 ini berbeda-beda setiap konsole nya seperti pada 27 Oktober 2006 untuk PS2, PC dan juga Xbox dan 2 bulan kemudian untuk Nintendo DS dan tentu nya untuk konsole PSP.

Concrete Inspection & Repair Work After the removal of formwork the element shall be checked for level, dimensions and surface defects, any non-conformity will be brought to the attention of Company before rectification. The action to be take to resolve any non-conformity will be proposed by main contractor and subsequently approved by consultant. Any patching, grouting or other such compound to be used for rectification works shall be submitted to and approved by consultant prior to its use. Curing compounds if used shall be approved and of the clear type. CONSTRUCTION JOINTS Construction joints shall be in the locations as indicated in the drawings, or as submitted in a proposal and always at right angles to the structural member’s axis. Kickers shall be used at the base of all columns and walls. Blinding Concrete Works Below is the equipment involved in blinding works: • Air compressor • Hand tools, hand saw, wire cutter, brush, and measuring tapes • Shovel • Concrete Pump • Wooden float Blinding Concrete Procedure: All the related documents such as shop drawings, method statements, material approvals, subcontractor’s approvals, test certificates, etc must be available on the site Ensure the source of supply of ready mix and grade of concrete.